The Shard Shortlisted for Stirling Prize

One of London’s modern architectural structures has been nominated for the 2014 RIBA Stirling Prize. The Shard has already previously won the RIBA London Award as well as the RIBA National Award. Wintech Engineering were required to provide CWCT Section 9 Hose Testing to various areas of the glazed façade during construction of the iconic building. http://www.architecture.com/StirlingPrize/RIBAStirlingPrizeShortlist2014.aspx […]

Read More…

Work of Art

Wintech Engineering are delivering testing services on the world renowned Tate Modern Gallery in London. A combination of Hose & Spraybar Testing is being provided for clients Seele on selective areas of the gallery designed by Herzog & De Meuron Architects. […]

Read More…

Win Tech with Wintech

The FIT Show 2014 is creeping closer and this year the Wintech Engineering stand is not to be missed as we’ll be giving visitors the chance to win an iPad Mini! Wintech will be holding LIVE demonstrations of testing Windows, Doors and Glass at Stand 124, Hall 1 for the duration of the 3-day FIT Show (10th-12th June […]

Read More…

Wintech Updated Their Status

Wintech Engineering Limited are pleased to announce that we are the first Notified Body of its type in the UK to provide Notified Testing Services for Curtain Walling and one of the first to provide Notified Testing Services for Windows, Doors and Glazing against the new Regulation. This comes as a result of an update […]

Read More…

FIT Show 2013

Wintech Engineering Ltd will be exhibiting at the annual FIT Show 2013. The FIT Show (Fabricator and Installer Trade) is a 3-day exhibition held at the Telford International Centre connecting the biggest names in glass and glazing from across the UK. It is the UK’s only national show for the window, door and conservatory trades […]

Read More…

Wintech achieves new heights

Following on from the successful completion and official opening of The Shard Building in Central London, Wintech Engineering is pleased to announce its involvement in the requirement for water testing during the construction process. CWCT Section 9 Hose Testing was successfully carried out by Wintech Engineering to various areas of the glazed facade earlier in […]

Read More…

Wintech undertakes testing for winning structure

The King’s Cross Station Roof Redevelopment Package has recently won the special award for re-engineering in London from the ICE London Civil Engineering Awards 2012. This spectacular new development is a project for which Wintech Engineering is proud to have played an important and successful role in the executing of regulatory CWCT Section 9 Hose […]

Read More…

All Aboard!

Telford based, UKAS accredited Wintech Engineering Limited, have recently undertaken the successful Regulatory CWCT Section 9 Hose Testing of the glazed roof structure at the Kings Cross Station new build in London. Appointed by Seele GmbH, the successful testing was carried out recently to specific parts of the new glazed roof structure using specially designed […]

Read More…

An insight into CE Marking

CE Marking is mandatory throughout Europe and in order to prove compliance with the Construction Products Directive (CPD), products require testing to be carried out by a Notified Body. CE Marking is, however, currently not mandatory for the UK market, but will become a legal requirement in the UK from July 2013. Wintech Engineering Limited […]

Read More…

Wintech makes an Impact

Wintech has recently seen a significant increase in the testing of glazed roofing for impact resistance in accordance with the CWCT Technical Notes 66 & 67. Testing for impact resistance ensures that a roof is able to resist both hard and soft body impacts as well as its ability to hold a static load. If […]

Read More…